Quick solar private limited - Polaar tex - Polaar logistics
500 KWP SOLAR HT INDUSTRIAL PROJECT 
500kwp Quick solar roof top project -yuvaraj tex - palladam - tirupur
We quick solar private limited - Polaar tex installed this solar power plant in sizing mills industrial solar project  M/S Yuvaraj sizing mills located in palladam , tirupur, here we installed in 2020 
here we made solar and diesel generator sincronisation with real time cloud monitoring 1st of its kind 
its a 1st of its kind with dedicated portal monitoring

poject capacity = 500 kwp solar panels
solar inverter = 500 kwp
solar module mounding structur = hotdip galvinised elevated structur its a special design in concept of re usable 
speciality = perfect latest design of its kind also proud its the latest technology solar project 

SOLAR COMMERCIAL PROJECT - IMPORTED MMS SOLAR 
10 KWP - QUICK SOLAR ROOF TOP - SHIVAM TILES IN TIRUPUR - TAMIL NADU
We quick solar private limited - Polaar tex installed this solar power plant in TILES SHOW ROOM 
Name M/S SHIVAM TRADES tiles show room located in KANGAYUAM ROAD tirupur, 
Installed in 2019

poject capacity = 25 kwp solar panels
solar inverter = 25 kwp
solar module mounding structur = IMPORTED MODULE MOUNTING STRUCTURE
Net Meater = Provided 

 SPECIALITY : The mms used were DIY plug and play no need of civil work its an american technology with 25 yr warrenty
1st of its kind in tirupur

100 kwp solar power plant @ tirupur
industrial solar roof top project in tirupur 
the factory an lt ct service with load 110 kw and we had installed 100 kwp
the shed type is galvalium sheet industrial shed 
we had provided frp platform for walk way its a turn key project with trina solar panel and kirloskar inverter the result is excellent 
SOLAR COMMERCIAL PROJECT - ZERO EB BILL
25 KWP - QUICK SOLAR ROOF TOP - SARAVANA MAHAL IN  TIRUPUR - TAMIL NADU
We quick solar private limited - Polaar tex installed this solar power plant in kalyanamandapam name M/S saravana mahal kalyana mandapam located in dharapuram road tirupur, here we installed in 2018 hence on those days there a special scheme of adjusting the excess units we have complete track record of till 2020 feb that they are paying only fixed charges , 100 % running in solar savings per year = 3,60,000  

poject capacity = 25 kwp solar panels
solar inverter = 25 kwp
solar module mounding structur = hotdip galvinised elevated structur 
achieved = zero elecrtricity bill for past 2 years